HomeLubang Jacob Peter Team members Introduction:
Mineral resources exploration,2020 Personal information
Address: Juba City Republic of South Sudan Contact: +8615608449971, (WeChat,) Email: jbl.jacobz24@gmail.com Date of birth: 01/1/1991: Nationality South Sudanese PERSONAL STATEMENT
Highly motivated and result orientated individual, As a recent graduate from university Of central south university I held several internships within leading companies. These internships enabled me to gain experience in the field and learn how to work under any condition.
Major: Geological resources and geological engineering 2020
Research direction: Mineral resources exploration and Prospecting using Geophysical methods such as Resistivity, Induced polarization (IP), TEM and Geological methods in finding Mineral and Economic ore reserves.
Education: · Currently pursuing masters in engineering geology (interested mainly in mineral exploration and prospecting), Central South University 2020 · Bachelor degree in engineering Science (mining engineering) department of geological resources and safety engineering, Central South university 2016-2020 During this period, studied the principles and techniques of mineral exploration, and underground and surface mining operations, as well as, mineral processing technologies. Studies include rock mechanics, rock fragmentation, plant and mine design, mine ventilation, surveying, valuation, industrial hygiene, mineral law, mine safety, computing, mineral processing, solution mining and operations research. Thesis topic; scheme design of overhand cut and fill underground mining method for tungsten mine at Yaogangxian mining area. The purpose of this designed method is to allow for safe extraction of ores in many areas where stope instability is prone (weak rock) or highly stressed ground conditions.
SKILLS Language: Bari native Other languages; English, Arabic, Chinese, good communication skills. Computer: Microsoft Access, computer skills ability to use different softwares.
Internships: · Engineering design for Mining methods and underground spacing at Chengzhou mining company, Chengzhou city July 2018
· Scheme Design of Filling Mining Method for Cut Wall of Black Tungsten Mine at Yaogangxian mining company limited.
June 2020 |
|