中文
Home
Journal Publications
Research Projects
Books
Honors and Awards
Courses
Journal Publications
[41]A Repairable GeoX /G/1 Retrial Queue with Bernoulli Feedback and Impatient Customers.Acta Mathematicae Applicatae Sinica, 2014, 30: 205-222.
[42]Geo/Geo/1 retrial queue with non-persistent customers and working vacations.Journal of Applied Mathematics and Computing, 2013
[43]The ruin problem in a renewal risk model with two-sided jumps.Mathematical and Computer Modelling, 2013, 57
[44]The GI/M/1 queue with Bernoulli-schedule-controlled vacation and vacation interruption.Applied Mathe matical Modelling, 2013
[45]A discrete-time Geo/G/1 retrial queue with preferred and impatient customers.Applied Mathematical Modelling, 2013, 37
[46]Dividend problems in the dual risk model with exponentially distributed observation time.Statistics and Probability Letters, 2013, 83
[47]An M/G/1 queue with single working vacation and vacation interruption under Bernoulli schedule.Applied Mathematical Modelling, 2013, 37
[48]Geo/Geo/1 retrial queue with working vacations and vacation interruption.Journal of Applied Mathematics and Computing, 2012
[49]Regulated absolute ruin problem with interest structure and linear dividend barrier.Economic Modelling, 2012, 29
[50]考虑流动储备金和利率的风险模型的分红问题冰.高校应用数学学报, 2012, 27 (2)
[51]The Maximum Surplus before Ruin in a Generalized Erlang(n) Risk Process Perturbed by Diffusion.Chinese Journal of Applied Prob. and Stat., 2011, 27
[52]Analysis of the finite source MAP/PH/N retrial G-queue operating in a random environment[J].Applied Mathematical Modelling, 2011, 35
[53]The perturbed compound Poisson risk model with linear dividend barrier.J. of Computational and Applied Mathematics, 2011, 235
[54]Discrete-time Geo1, GeoX2/G1, G2/1 retrial queue with two classes of customers and feedback.Mathematical and Computer Modelling, 2011
[55]一类具有随机保费风险模型的破产问题.应用数学学报, 2011, 34
[56]随机环境中马氏链的大数定律和强大数定律.应用概率统计, 2011, 27
[57]Nagumo type existence results of Sturm–Liouville BVP for impulsive differential equations.Nonlinear Analysis, 2011, 74
[58]A discrete-time Geo/G/1 retrial queue with preemptive resume and collisions[J].Applied Mathematical Modelling, 2011, 35
[59]Estimates for the optimal control policy in the presence of regulations and heavy tails[J].Economic Modelling, 2011 (28)
[60]The GI/M/1 queue with start-up period and single working vacation and Bernoulli vacation interruption.Applied Mathematics and Computation, 2011, 218
total173 3/9
first
previous
next
last
Page
刘再明
Recommended Ph.D.Supervisor
Recommended MA Supervisor
Central South University All rights reserved 湘ICP备05005659号-1
Click:
MOBILE Version
The Last Update Time:
.
.