Failure mechanism of full-length grouted bolts for large-deformation tunnels under high geo-stress: A case study
发布时间:2026-03-17
点击次数:
DOI码:10.1016/j.engfailanal.2024.108021
发表刊物:ENGINEERING FAILURE ANALYSIS
是否译文:否
发表时间:2024-03-21
Failure mechanism of full-length grouted bolts for large-deformation tunnels under high geo-stress: A case study
发布时间:2026-03-17
点击次数:
DOI码:10.1016/j.engfailanal.2024.108021
发表刊物:ENGINEERING FAILURE ANALYSIS
是否译文:否
发表时间:2024-03-21