中文

Study on method of high-speed railway bridge pier and abutment pile foundation settlement long-term monitoring

Hits:

  • Release time:2018-06-13

  • Journal:1st International Conference on Railway Engineerin

  • Place of Publication:Beijing, China

  • Co-author:Zhao, J., Leng, W.-M., Yang, Q., Xu, F.(徐方)

  • Document Type:C

  • Page Number:724-729

  • Translation or Not:no

  • Date of Publication:2010-08-06


Central South University  All rights reserved  湘ICP备05005659号-1 Click:
  MOBILE Version

The Last Update Time:..