Release time:2019-03-06
Code of Certificate:2014-3-28-R5
Grade of Award:三等
Type of Award:2014年度中国建筑工程总公司科学技术奖
Date of Award:2014-12-01
Pre One:Study on the calculation method of the whole life of shield tunneling structure under erosion environment
Next One:Construction technology of large section overpass tunnel under water
The Last Update Time:..