中文

Study on deformation control and rapid construction technology of shallow-buried double-track railway tunnel in soft plastic red clay stratum

Hits:

  • Release time:2019-03-06

  • Granted by:中国建筑工程总公司

  • Code of Certificate:2017-2-12-R2

  • Grade of Award:二等

  • Type of Award:2017年中建总公司科学技术奖

  • Date of Award:2017-12-30


Central South University  All rights reserved  湘ICP备05005659号-1 Click:
  MOBILE Version

The Last Update Time:..