Adaptive Site Selection and Task Scheduling for Grid Workflow
Hits:
|
Pre One:Variational analysis of the ultimate pullout capacity of shallow circular anchor plates in rock foundations based on the Hoek-Brown failure criterion
Next One:Variation Analysis of Ultimate Pullout Capacity of Shallow Horizontal Strip Anchor Plate with 2-layer Overlying Soil Based on Nonlinear M-C Failure Criterion