Release time:2016-03-31
Affiliation of Participant(s):Central South University
Status:已结题
Date of Project Completion:2014-03-31
Date of Project Initiation:2012-03-31
Pre One:Study on construction technology of shield tunnel under shallow covered and porous and composite stratum
Next One:Study on deformation control technology of soft surrounding rock tunnel of red bed in Southwest China
E-mail:012ca31c372fefbe38899ef52bbd3f75351736aa46ab2b47ad5718526f861120842c43d2d3cf06416bcda498ea87773e1ad33a25e892845d393e54862a137fa846e3393c8625533a835d6854295f6634651cb98717fa21b7cfa3578dd85ce8df3882be5a09ad870e8fe2b8c9a6584db01671269fcd67343fabc3f7cd61112624
The Last Update Time:..