
Research Projects
- [41]Study on underground excavation technology of subway station in sand layer with rich water,开始日期:2008-03-31,结项时间:2009-12-31.
- [42]Study on the feasibility of Fuzhou Metro Line 1 in the West throat area under the shield of the train station,开始日期:2011-03-31,结项时间:2011-12-31.
- [43]Aerodynamic effect calculation of underground engineering in Z1 line of Tianjin rail transit,开始日期:2011-03-31,结项时间:2012-03-31.
- [44]Study on the Kunming passenger line tunnel in carbonaceous slate stratum deformation mechanism and deformation control measures,开始日期:2011-03-31,结项时间:2012-03-31.
- [45]Study on design and construction method of Unsymmetrical Pressure Tunnel,开始日期:2009-03-31,结项时间:2011-03-31.
- [46]Study on prevention and cure technology of salt corrosion in concrete structure of railway tunnel
- [47]Study on the deformation monitoring scheme and typical section of the line of Wuhan Guangzhou Passenger Dedicated Line,开始日期:2005-03-31,结项时间:2008-03-31.
- [48]重载铁路隧道结构承载特性及结构设计研究(横向)
- [49]铁道部重点项目:Study on dynamic properties of high speed railway tunnel structure,开始日期:2008-03-31,结项时间:2011-03-31.
- [50]Research on key technology and risk management of Liuyang River Tunnel Construction under complex geological condition,开始日期:2009-03-31,结项时间:2010-03-31.
- [51]Study on construction technology of underwater, overpass, shallow buried and large section tunnel,开始日期:2010-03-31,结项时间:2012-06-30.
|
-
施成华

 Email:012ca31c372fefbe38899ef52bbd3f75351736aa46ab2b47ad5718526f861120842c43d2d3cf06416bcda498ea87773e1ad33a25e892845d393e54862a137fa846e3393c8625533a835d6854295f6634651cb98717fa21b7cfa3578dd85ce8df3882be5a09ad870e8fe2b8c9a6584db01671269fcd67343fabc3f7cd61112624
 Mobile:1649fdf190ec1f0e642c036e112e47bcdf6feb183fba218906285bed29d89bc33a0b8a22228fd1909268ab62a07c89083607d138f48e31049b02f51a7f7c6d296dbd91fe50d8a3cbb509bc8ca78a0f453b7c859ec11dfd556962555b2ada3dc0b339528cb7589236993a250665cf216da68388eae3a560db7847f84d157a26d7
|