Release time:2016-03-31
Affilication of Author(s):College of civil engineering
School Sign:CSU
Patent Applicant:雷明锋等, 彭立敏, 施成华
Type of Patent:Invent
State of Patent:Authorized patents
Authorization number:ZL 201110286713.5
Service Invention or Not:no
Pre One:An underwater tunnel underground construction design method of grouting reinforcement ring thickness
Next One:Based on an engineering control measures method of determining the minimum depth of underwater tunnel
E-mail:012ca31c372fefbe38899ef52bbd3f75351736aa46ab2b47ad5718526f861120842c43d2d3cf06416bcda498ea87773e1ad33a25e892845d393e54862a137fa846e3393c8625533a835d6854295f6634651cb98717fa21b7cfa3578dd85ce8df3882be5a09ad870e8fe2b8c9a6584db01671269fcd67343fabc3f7cd61112624
The Last Update Time:..