Yipeng Xie, Junsheng Yang, Cong Zhang, and Jinyang Fu,Structures and Settlement Control of Yujingshan High-Speed Railway Tunnel Crossing Massive Rockfill in a Giant Karst Cave, Transportation Research Record,2021:1-14,https://orcid.org/0000-0002-5972-6805
发布时间:2022-02-04
点击次数:
是否译文:否
附件:
上一条: Linyi Li, Junsheng Yang, Jinyang Fu, Shuying Wang, Cong Zhang, Maolong Xiang, Experimental investigation on the invert stability of operating railway tunnels with different drainage systems using three-dimensional printing technology, Journal of Rock Mechanics and Geotechnical Engineering (2022), doi: https:// doi.org/10.1016/j.jrmge.2021.12.013
下一条: 张宇, 阳军生, 祝志恒, 等. 基于图像点云的多维度隧道初期支护大变形监测研究和应用
