Yang, J.S., Xiang, M.L., Wu, J. et al. High-Speed Railway Tunnel Bottom in Nearly Horizontally Soft and Hard Interlayered Strata: Deformation Mechanism and Countermeasures. J Min Sci 60, 242–250 (2024)
发布时间:2024-10-01
点击次数:
是否译文:否
收录刊物:SCI
附件:
上一条: 罗钰博,阳军生,詹双桥,张庆彬,陈运财,张聪.基于 GSI 分级的小断面引水隧洞超欠挖预测与钻爆参数优化研究[J/OL].岩石力学与工程学报,2024
下一条: Yu Tang, Junsheng Yang, Yuyang You, Jinyang Fu*, Xiangcou Zheng, Cong Zhang. Multi-output prediction for TBM operation parameters based on stacking ensemble algorithm. Tunnelling and Underground Space Technology 152 (2024) 105960