中文

Interaction between continuous welded rail and long-span steel truss arch bridge of a high-speed railway under seismic action

Hits:

  • Release time:2025-09-18

  • DOI number:10.1080/15732479.2017.1386690

  • Journal:STRUCTURE AND INFRASTRUCTURE ENGINEERING

  • Co-author:Liu, Wenshuo, Dai, Gonglian, Yu, Zhiwu, Chen, Y Frank, He, Xuhui

  • Volume:14

  • Issue:8

  • Page Number:1051-1064

  • Translation or Not:no

  • Date of Publication:2018-01-01


  • Email:

Central South University  All rights reserved  湘ICP备05005659号-1 Click:
  MOBILE Version

The Last Update Time:..