何丽玉,陈晓斌.静压桩施工应注意的几个问题[J].西部探矿工程,2004(06):40-42
发布时间:2018-08-10
点击次数:
是否译文:否
上一条: Jiangnan Guo, Jinlong Liu, Xinxin Zhang, Xiyuan Guan, Muhong Zeng, Jiarong Shen, Jianing Zou, Qiuzhu Chen, Tian Wang and Dong Qian (通讯作者). Synergistically coupling Pt with Ni toward accelerated water dissociation for enhanced alkaline hydrogen evolution, J. Mater. Chem. A, 2022, 10, 13727. (第一作者为2019级硕士生)
下一条: Zhouli Li, Jun Ren, Chunming Yang, Yaxin He, Yun Liang, Jinlong Liu, Junhua Li, Dong Qian (通讯作者). Sodium 5-sulfosalicylate-assisted hydrothermal synthesis of a self-supported Co3S4?Ni3S2@nickel foam electrode for all-solid-state asymmetric supercapacitors, J. Alloy Compd., 2021, 889, 161661. (第一作者为2018级硕士生)