[38] Huanzhong Sun, Weiqi Zheng*, Zhihui Zhu, Yonghong Yang, Xingwang Sheng. Multi-Stage Tensioning Construction of Suspension Rods in Long-Span Bridge Enhanced by Rapid Detection Using Ground-Based Microwave Radar
Release time:2026-06-13 Hits:
Journal:Smart Structures and Systems, 2026,37,1-16.
Translation or Not:no
Pre One:[39] Xingwang Sheng, Su Zeng, Weiqi Zheng, Zhihui Zhu, Jiexin Zhong, Yonghong Yang. Full-process seismic response analysis of long-span cable-stayed-suspension bridges considering source-path-terrain-structure effects
Next One:[37] Zhihui Zhu, Jiaqi Yan, Weiqi Zheng*, Wei Gong, Jie Cao, Fangfang Li, Jiajia Yan. Evidence-veriffable intelligent interaction system and defect knowledge graph for operation-and-maintenance diagnosis of high-speed railway infrastructure