Release time:2020-04-17
Journal:Geotechnical & Geological Engineering
Co-author:Zhang Pingping., Deng E., Lei Mingfeng, Yin Rongshen, Yang Weichao
Document Type:J
Volume:2018,36
Issue:2
Page Number:723-735
Translation or Not:no
Pre One:Time resolved aerodynamic loads on high-speed trains during running on a tunnel–bridge–tunnel infrastructure under crosswind
Next One:Modified chloride diffusion model for concrete under the coupling effect of mechanical load and chloride salt environment
The Last Update Time:..