Interval non-probabilistic reliability of a surrounding jointed rockmass in underground engineering: a case study
Hits:
|
Pre One:Pre-alarm system based on real-time monitoring and numerical simulation using internet of things and cloud computing for tailings dam in mines
Next One:Theoretical and experimental studies of localization methodology for AE and microseismic sources without pre-measured wave velocity in mines