Release time:2018-06-25
Journal:Computer-Aided Civil and Infrastructure Engineerin
Co-author:Xuemin Zhang, Junsheng Yang, Jinyang Fu*, Zhiheng Zhu
Volume:31
Issue:12
Page Number:936-953
Translation or Not:no
Date of Publication:2016-06-25
Attachments:
Pre One:Performance Evaluation of Long Pipe Roof for Tunneling below Existing Highway Based on Field Tests and Numerical Analysis: Case Study
Next One:Deformation Response of an Existing Tunnel to Upper Excavation of Foundation Pit and Associated Dewatering
The Last Update Time:..