An Improved Monte Carlo Method Based on Neural Network and Fuzziness Analysis: A Case Study of the Nanpo Dump of the Chengmenshan Copper Mine
发布时间:2021-09-27
点击次数:
DOI码:10.1155/2021/6685190
发表刊物:MATHEMATICAL PROBLEMS IN ENGINEERING
合写作者:Wu, XD, Wu, LW
第一作者:Gao, F
论文编号:6685190
是否译文:否
发表时间:2021-01-15
收录刊物:SCI