- [41]Background monitoring system for security power station,开始日期:2013-06-06,立项时间:2013-06-06,结项时间:2013-12-06.
- [42]Design of dynamic reactive power compensation and harmonic control device,开始日期:2012-03-06,立项时间:2012-03-06,结项时间:2012-12-06.
- [43]Safety performance test of main electric equipment in mining area,开始日期:2010-05-06,立项时间:2010-05-06,结项时间:2010-12-06.
- [44]科技部高技术研究发展中心:重金属冶炼过程多组分在线在线分析与检查技术(2009AA04Z124),唐朝晖,开始日期:2009-06-19,立项时间:2009-06-18,结项时间:2011-12-31.
|
-