Language :
English
中文
Menggang Yang
Home
Journal Publications
Research Projects
Books
Patents
Teaching
Honors and Awards
Recommended Ph.D.Supervisor
Recommended MA Supervisor
MOBILE Version
Research Projects
Current position:
Home
>
Research Projects
[1]国家自然科学基金面上项目:大跨度纵飘桥梁水平双向复合型减振震系统协同工作机理和优化设计研究(编号:52278232),54万,2023.01-2026.12 (主持)
[2]滨海强风场区高速铁路大跨度矮塔斜拉桥施工关键技术研究,150万,2024.6-2026.12(主持)
[3]珠肇高铁螺洲溪大桥和荷麻溪特大桥施工监控,157.56万,2024.4-2026.12(主持)
[4]小半径多跨连续钢箱梁整体顶推及高位落梁施工关键技术研究,45万,2023.4-2024.10(主持)
[5]沪渝蓉高铁桥梁施工监控与检算,40.5万,2022.4-2023.4 (主持)
[6]国家自然科学基金面上项目:基于碰撞时变行为的高速铁路桥梁抗震协同工作机理和优化策略研究(编号:51978667),60万,2020.01-2023.12 (主持)
[7]中国铁路总公司科技开发计划重点课题:大跨度铁路桥梁纵向减振/震的速度型与位移型阻尼器组合系统研究(编号:N2018G070),80万,2018.12-2020.12 (主持)
[8]潍莱铁路大跨径桥梁施工监控,148万,2018.6-2019.12 (主持)
[9]国家自然科学基金面上项目:地震下连续梁桥支座与侧向挡块摩擦行为的时空演变及耦合机理(编号:51778635),60万,2018.01-2021.12 (参加,排名第2)
[10]Research on collision mechanism, collision process and anti-collision control for high-speed railway bridge subjected to strong earthquake (NSFC,No.51378504)
[11]104 national road in west of wenzhou ou jiangte super-large main bridge (140 + 225 + 225) m cable-stayed bridge construction monitoring.
[12]The National Natural Science Youth Foundation :Tear down analysis of continuous girder bridge seismic displacement based on the needs of simplified theoretical resear
[13]The National Natural Science Youth Foundation : Based on MR Damper vertical floating bridge passive damping - semi-active damping control study
[14]The National Natural Science Foundation of China: on the surface of the Strong Wind light rail vehicles - car - the male rail system dynamic response mechanism and Comfort Driving Safety Study
[15]Shanghai-kunming kezhuan of changsha- liuyang river extra-large bridge (64 + 116 + 64) m continuous girder bridge construction monitoring .
[16]Expansion project of xiang-gui railway GTXG - 1 about long-span prestressed concrete continuous girder bridge construction control system research.
[17]Jin qin railway passenger dedicated line engineering of the dock JiYunHe super-large bridge (80 + 128 + 80) m continuous girder bridge construction monitoring
[18]Shwu Kezhaun (henan section) SWZQ - 1 standard 4 (40 + 64 + 40 m continuous girder bridge line monitoring
[19]Ji tea high-speed unity 3 curved beam bridge bearing performance analysis and research
[20]The National Natural Science Foundation of China: on the surface of cable-stayed bridge cable wind vibration field observations and the semi-active control research
total21 1/2
first
previous
next
last
Page